Industrial control system testbed implementation
2015-2016/I.
Dr. Holczer Tamás
Industrial control systems can control power plants, power grids or production in factories. More and more attacks are aimed at these systems. These attack must be understood to mitigate them. The task of the student is to help to implement a testbed, where the attacks can be reproduced, or new attacks and defence techniques can be developed. The testbed is implemented in a collaboration with company Evopro (www.evopro.hu).
2
0